Here is DH's mirror - we'll have to put some artwork up on the blank wall...
DH also built me 2 more shelves in the utility closet across from the powder room. He installed 2 outlets so I can plug in phone/GPS chargers and my sweeper vac.
I managed to get a lot of my house decorating done. The goal was to get it done in time for the church women's dinner party that I hosted last night. I had everything done except for the tree, and it (for us) is still a tad too early to get the tree. I think we'll probably get the tree this weekend. Here is the fireplace with my new wreath over the mantel...
I hung greens around the border of the great room on the valance. I had to get up and down off the ladder every loop in order to move the ladder - it was a good thigh workout! In order to get the swags even, I laid out each section on the floor next to a tape measure and connected a wire ornament hanger to the greens every 3 feet. Then I just had to make sure the bottom of the swag hit the bottom of the valance and there was no need to measure where to hang each hook.
The Santa/Reindeer quilt and nativity are in the entryway...
Underneath the table I put all kinds of stuffed animals and toys, most of them belonging to our kids over the years (and some that even belong to DH and I when we were little).
The stairs were adorned with lights and more greenery...
We set up the tables for my dinner party on Sunday night and I set them and decorated them on Monday. I was expecting 15 guests (plus me) for the third year in a row. There must be something about the number 16 and our women's dinner - they are not the same exact women every year either. Interesting...
Here are the Santa napkins on the table settings - no one wanted to use the napkins for fear of ruining them!
And other place setting...
So, some of the next projects on the list are to find tiles for the backsplash of the beverage area, and to find floor tile for the floor at the bottom of the basement stairs (that we can see when we look down over the stair railing). Here is the beverage area that we want to tile...
I'm thinking I'd like to bring in some of the red color from the adjoining family room. Here is one with very narrow tiles (1/4") in shades of red...
This one has several colors in it which would pull in the colors of the cabinets, counter, and the red from the other room. It seems a little dark to me though, so I'm just not sure. I also have samples of smaller red squares in colors similar to the above tile. Maybe we can combine this tile with some of the red squares, or something...
And in the continuing saga of our hunter...He has never returned - his blind is still down in back of the house, collapsed from the wind. It's very strange...
Wednesday, December 10, 2008
We have mirrors! And shelves!
Friday, July 11, 2008
Hmmmm...
Countdown to moving day: 18 days and counting!
Tuesday, July 8, 2008
Recess is over!
The stairs are just about done. They were working on the very last small section closest to the attic level, so the stairs should be finished today. It's not nearly as scary to look down through the center of the stairs to the basement when the banisters are on, as it was without any railings. I'll try to remember to take another photo of the open area of the stairs from the attic level to the basement the next time we're out there. I couldn't get up past the stair guys to the 3rd floor so I don't know if anything has been done up there, or not.
The plumbers were there today also, getting ready to install sinks, toilets, and faucets in all the bathrooms, and the sink in the sewing studio. He asked me a couple of questions and in the process we figured out that there must have been 2 Blanco kitchen sinks and 2 Blanco kitchen prep sinks ordered for the house. The plumber had one of each sink and I told him that the granite guys had taken one of each sink back to the shop the day they were at the house to template for the kitchen granite. I'm wondering if our builder noticed they were missing and re-ordered them, perhaps thinking they had been stolen. I'll let the builder, plumber, and granite people figure it all out!
The builder said that the hardwood floors in the family room, great room, and office should be sanded and stained early next week. After that is done, the electrician can come back and install fans and light fixtures.
DH thought it might be prudent to change our move date, given how much still has to be done on the house. Our original move date was 7-23 and he moved it back to 7-29, which is just before we close on this house, so there isn't any leeway left now. I called and changed the delivery date of the washer and dryer so we won't have to be out at the house on the 28th waiting for them to arrive. It will be good to have another 6 days to pack, but I'm anxious to get moved into the house.
Countdown to move date: 21 days and counting (again!).
Thursday, July 3, 2008
Oooooh! Love the bathroom stone!
Remember to answer the poll on the newell post choices! :-D
