Monday, June 2, 2008

Cabinets!!

My cabinets started going in today! I'm not sure how many days it will take them to finish, but the granite counters are supposed to be templated a week from today and then installed 2 weeks after that. These are the cabinets near the refrigerator. The angled cabinet on the right has 4 doors - all of them are hinged on the right. I want to see if they'll change it so the 2 on the left are hinged on the left and the 2 on the right are hinged on the right. The cabinet over the refrigerator is pulled out from the wall so that it will be flush with the front of the refrigerator and easier to access. There are 4 roll-out shelves in the bottom of the left cabinet. The sink wall (L-->R) corner cupboard, 3 drawer unit which will be for our everyday dishes, dishwasher opening, super susan unit, narrow tray cabinet, sink, 2 pull-out trash cabinets (one for trash, one for recyclables).
End cabinet and 3 drawer unit...
The beverage center area - these don't seem to be placed where they should be yet.
The family room floor is done and the office floor was also finished.
The bamboo flooring for my sewing studio, laundry room, and 2nd floor hallway is ready to be installed...isn't it gorgeous?
The KD also designed our master bathroom and his tile guy is on another job. He will show up next Monday to start the installation of our tile.

I think it's time to start packing up so more of this house so we'll be ready to move in a few weeks!