The fireplace area has been framed,
the stairs have been delivered,
a couple of the stair landings have been built in preparation for putting in the stairs,
a couple of the stair landings have been built in preparation for putting in the stairs,
the pipes have been laid in the basement and covered with gravel in preparation for pouring the slab and the plumbing for a future bath is in place,
the arch in the great room has been built,
all the windows are in,
the exterior wall of DS's room is now finished, the octagonal window near the front door was lowered (as per our request, as I couldn't see out of it in the original position),
and the awning has been built off the back of the garage as part of the patio area (didn't get a photo of this).
the arch in the great room has been built,
all the windows are in,
the exterior wall of DS's room is now finished, the octagonal window near the front door was lowered (as per our request, as I couldn't see out of it in the original position),
and the awning has been built off the back of the garage as part of the patio area (didn't get a photo of this).
3 comments:
your lizard is cute
Thanks!
That sure is a lovely picture of me...
Post a Comment