Here is the beverage area...
And the island...
And the cooktop/eating bar area...
DD's window seat is now covered in stained wood...
These are the closet shelves in DS's room - they are a bit odd in their arrangement...
The sink has been installed in my sewing studio...
We now have a furnace and a water heater in the basement...
And the doors have been installed at the bottom of the stairs in the basement...
Things are moving along. Monday, Tuesday, and Wednesday the hardwood floors are supposed to be sanded and sealed and driveway poured. Thursday and Friday the kitchen cabinet guy and the master bathroom tiler should be back to finish up and the following Monday the carpets are supposed to be installed. I don't know the schedule for the rest of the subs - plumber, electrician, etc. but the end is in sight!
The sink has been installed in my sewing studio...
We now have a furnace and a water heater in the basement...
And the doors have been installed at the bottom of the stairs in the basement...
Things are moving along. Monday, Tuesday, and Wednesday the hardwood floors are supposed to be sanded and sealed and driveway poured. Thursday and Friday the kitchen cabinet guy and the master bathroom tiler should be back to finish up and the following Monday the carpets are supposed to be installed. I don't know the schedule for the rest of the subs - plumber, electrician, etc. but the end is in sight!
Countdown to moving day: 18 days and counting!