Monday, July 21, 2008

Step by tiny step...

The house is looking quite finished from the front, except for the rough grading, and top soil that needs to be spread. The front porch looks finished, except for the columns that need to be painted. The builder added a stone-covered pillar in the front of the house to display our house number and for the outdoor light to sit on.
The bathroom tiler must have worked today - the shower has had an enhancing sealer applied and the whole shower is now grouted. The sealer really brought the colors out. The tub still hasn't been grouted yet, but the plumber installed the shower heads and handles.
The carpet was partially finished. They completed the carpet installation in the guest bedroom...
and in the music room...
But the carpet in the other bedrooms and the third floor hallway wasn't done. All the pieces are there and laid out, but not installed. This is the master bedroom carpet...
This is DS's bedroom...
I'm not going to repeat the list of what needs to be finished, as not enough was done today. The kitchen guys hadn't done anything new, the electrician hadn't been back, and if the septic guys were there at all, they didn't get finished.

Countdown to move day: 8 days and counting!