Thursday, July 17, 2008

The septic man cometh!!

Hallelujah! The septic system is going in! We were excited to see the septic man's equipment at the house tonight.
He has been busy digging trenches and holes for the tanks.
The front door has been stained and sealed and the columns have been started. The column bases will have stone on them.
The refrigerator was in the garage (I'm hoping that isn't a sign of it not fitting), but all the other appliances were in place in the kitchen.
The beverage area is almost finished. The glass is in the doors and the ice maker, beverage refrigerator and oven are in place. The faucet has also been installed. I'm not sure why the faucets went in before the granite backsplash - it seems like it will be trickier to install the granite with the faucets in place. The cabinet pulls have also been added.
Here is the main oven, installed under the cooktop...
And the dishwasher is in place...
The main faucet is in...
And it is VERY close to the window trim...we are going to wait until the granite backsplash is installed and then maybe we'll have the window trim cut back a little bit.
The woodwork in the great room has been sealed. It looks much better without all the white dust all over it.
The master bathroom tiler worked today and finished the floor in the shower, the seat in the shower, and the stone baseboard. He will be back tomorrow to grout everything. This is the stone baseboard...
So, thank you to those who voted on the newell post topper. We decided to go with the square topper.
The fireplace mantel has been stained to match the cherry cabinets in the kitchen.

Items completed as of today are marked in green...(I added a couple of items that I had forgotten about.)

septic tank
gas lines - still need to be connected
furnace
A/C
painting
kitchen - granite, finish work, vent fan, pulls, granite backsplash, appliances
plumbing
electrical - lights/fans, valance lights
gutters
brick/stone/pillars
driveway - concrete, gravel
grading - rough, topsoil
sewing studio - knobs/pulls, upper crown moulding on cabinets
master bath - grout, finish shower, cabinets, glass doors, baseboard stone, granite
stained woodwork on great room walls
closet shelves/rods
pantry shelves
stain front door
paint garage doors, install gaskets
grab bars on guest tub
shower curtain rods in 2 bathrooms
stairs
fix vanity granite backsplash in kids' bathroom, recess medicine cabinet?
top for windowseat
doors on bookcase shelves in great room
doorknobs
carpet
fireplace granite surround

So, it turns out that the kitchen granite backsplash has not been templated. The granite fabricators will be there tomorrow to template for them. The carpet is going in on Monday, the master bathroom shower doors will be installed on Tuesday, and the granite in the master bathroom and (hopefully) the kitchen granite backsplash will be installed on Thursday.

Countdown to move day: 12 days and counting!